radiator facility

radiator facility

Tianjin, China
Kunlun Sun
Contact person

Basic Information

The whole line is including: 1. fin press line with die 2. Straightening and cutting the aluminum tube 3. Assembly the fins together, and place the tube into the fins, that is called working table. 4. Expanding the tube and flaring the tube 5. Assembly the side plate 6. Install the main fins and sealing gasket in two ends. 7. Extend the head of tubes 8. Install the plastic water tank 9. Seal the water tank 10. Leakage testing 11. Finish the whole product

Delivery terms and packaging

Port: any port

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1

    Дата события:

    12.10.2016 - 18.10.2016
    Catalog
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product